After the Summit mine stopped and Santa Fe Gold sought bankruptcy protection in 2015, its lender Waterton acquired the mine in 2016. The Summit and the Banner mill near Lordsburg then passed to Pyramid Peak Mining and in 2021 to Summit Gold Corporation, which told the state in December 2025 that it intended to restart the mine. Santa Fe Gold, whose subsidiary agreed in 2019 to buy the Jim Crow Imperial and Billali mines, said in March 2024 that it was withdrawing from its New Mexico mining project, citing water-rights payments and costly financing.

Five employees at Santa Fe Gold, 2014 and 2015

Santa Fe Gold, owner of the Summit mine in the Steeple Rock district, gave its staff count in one line of its annual report: "As of June 30, 2015, we had five employees." In 2013 it had employed 65. Santa Fe Gold said about 16,295 feet of underground openings had been driven at the Summit since the project began. Its ore went by truck 57 miles to the Banner mill near Lordsburg, the company said, for crushing, grinding and flotation, a process that separates the metal-bearing particles in a froth. In August 2015, after it fell behind on payments to its secured lenders, Waterton and Sandstorm, Santa Fe Gold sought protection under the Bankruptcy Code.1

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2015 (filed 2017): Item 1, Employees; Item 1/Item 2, Summit project description; Item 1A, Risk Factors; Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 1.0(c), p. 1-1

A technical report prepared in 2014 by Chapman, Wood & Griswold for Santa Fe Gold and Canarc Resource Corporation describes the mine as it stood in 2014. It puts the Summit 16 road miles northeast of Duncan, Arizona. From Duncan the road ran 1.2 miles on Arizona highway 75, then 13.5 miles on the gravel Carlisle Road, whose first 5 miles lie in Arizona, then 1.5 miles on Summit Peak Road. Both were county roads. A second way in, the Bitter Creek road, ran 26 miles from Duncan, and the report describes it as a poorly maintained public road serving several ranches. The report gives the haul to the mill as 57 miles, 15 of them over gravel road.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17)

In 2014, by the report's account, cattle ranching was the main use of the land around the Summit. The nearest residents lived two miles to the northwest in the Bitter Creek drainage, and the Apache Box Wilderness Study Area began a mile north of the mine. Its workers commuted daily from Duncan in a company van. Water for the operation had been hauled in from Duncan as well. Electricity was generated on site, and a 15-mile power line up Bitter Creek was being planned with the local electric cooperative.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17)

Chapman, Wood & Griswold's report, prepared for the mine's owners, describes the mine's neighbors. "The economy in the area is relatively depressed," the report says, and Duncan and Lordsburg depended on well-paying mining jobs. No negative comments had been filed in response to the permit notices, it adds. Water was a regulatory question too. According to the report, the New Mexico Environment Department told Lordsburg Mining Company on 2 March 2014 that discharging its mine water would not need a discharge permit. Discharge to the surface, though, would require acquiring water rights.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 20, p. 20-3; Section 4.1.5(e), p. 4-6

Standby and a lender's purchase of the Summit, 2014 to 2016

The Lordsburg Mining Company, which operated the Summit and the Banner mill, explained the stop in an application of 5 August 2015. Its mill's last concentrate had shipped in September 2014, the company said. It asked the state to put the Banner mill on standby, because the Summit mine had run out of money before its development reached the higher-grade ore. A later filing by Summit Gold Corporation says Lordsburg Mining ran the mill on Summit ore from 2008 to 2013. The state's Revision 20-1 of 2021 put the mill on standby and set 8 May 2014 as the official start date.

Sources: Application for Revision of HI001RE Mining Act Permit to Standby Status, The Lordsburg Mining Company (2015-08-05): Application, items B(1) and B(6); Request to Transfer the Summit Mine Reclamation Permit GR011ME (Pyramid Peak Mining, LLC to MMD) (2016-10-31): Letter, p. 1; Summit Gold Corporation, Banner Mill and Tailings Facility Permit HI001RE, Application for Mine Permit Modification (return to active status) (2026-02-15): Section 2, Project History, p. 2; Section 2, p. 2; date of Revision 20-1 (08/26/2021) from Section 3.1 Permit Chronology table

Lordsburg Mining still planned exploration after the shutdown. On 29 September 2014 it applied to modify the Summit permit for surface core drilling, which brings up solid cylinders of rock for testing. Its drill pads would sit along Summit Peak Road on the Irish Jew claim. On the application form the company answered no to whether the project lay in a known cemetery or other burial ground, and it named Duncan, Arizona as the nearest town.

Sources: The Lordsburg Mining Company, Lordsburg Mining Company, Summit Mine GR011ME: Transmittal of Modification Request (surface exploration core drilling), with Modification Application (2014-09-29): Application Section 2 (Right to Enter), p. 4; Check-off list, p. 1 (box marked 'x No')

Santa Fe Gold lost the Summit in the bankruptcy. On 26 February 2016 Waterton, its senior lender and the only successful bidder, acquired substantially all of the company's assets, the Summit mine among them. The purchase was a section 363 sale, a sale of a bankrupt company's assets approved by the court. On 15 June 2016 the bankruptcy judge signed the order dismissing Santa Fe Gold's Chapter 11 case, No. 15-11761. A 2017 state booklet by the New Mexico Bureau of Geology and Mineral Resources gives the district's record to that point. It estimates that the Steeple Rock district produced $10 million in gold, silver and base metals between 1880 and 2014, and lists the Summit as on standby.1

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2015 (filed 2017): Notes to financial statements, '363 Asset Sale'; Item 7, Liquidity

New holders of the Summit and Banner permits, 2016 and 2017

On 31 October 2016 Pyramid Peak Mining, LLC, of Lordsburg asked the state to transfer the Summit mine's reclamation permit, GR011ME, from the Lordsburg Mining Company. Pyramid Peak said it owned the patented claims, mining claims for which the federal government has issued title. It also said it had posted a $95,175 surety bond, a guarantee that pays for reclamation if the operator does not. Pyramid Peak acquired the project in 2016. Summit Gold's later filing says Pyramid Peak took the Lordsburg and Summit properties, and that the Banner mill permit, HI001RE, passed to it in January 2017.

Sources: Request to Transfer the Summit Mine Reclamation Permit GR011ME (Pyramid Peak Mining, LLC to MMD) (2016-10-31): Letter, p. 1; Application for Revision of HI001RE Mining Act Permit to Standby Status, The Lordsburg Mining Company (2015-08-05): Application, items B(1) and B(6); Summit Gold Corporation, Banner Mill and Tailings Facility Permit HI001RE, Application for Mine Permit Modification (return to active status) (2026-02-15): Section 2, Project History, p. 2

Pyramid Peak's link to the lender appears in a later announcement. In a press release of 16 March 2021, Galane Gold Ltd. described Pyramid Peak as a wholly owned subsidiary of a Waterton fund, Waterton Precious Metals Fund II Cayman, LP. Galane Gold said it had agreed to buy the Summit mine and the Banner mill's infrastructure from Pyramid Peak for US$17.0 million.

Sources: Galane Gold Ltd. Announces Proposed Acquisition of the Summit Mine in New Mexico (press release reprinted by MarketScreener) (2021-03-16): Press release of 16 March 2021

Two company documents give different sizes for the Banner mill. Santa Fe Gold's annual report for the year ending 30 June 2015 describes it as a 400-ton-per-day flotation plant. Chapman, Wood & Griswold's 2014 technical report calls it a 240-ton-per-day mill.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2015 (filed 2017): Item 2, Properties (Banner mill)

The waste-rock slide at the Summit mine, 2017 to 2019

Early in 2017 the Summit mine's waste-rock stockpile failed. Waste rock is the broken rock dug out to reach the ore and left unprocessed. According to Pyramid Peak's revised corrective action plan, a section of the pile about 250 feet wide moved downslope as much as 150 feet. A second, smaller slide followed that fall. The state Mining and Minerals Division asked Pyramid Peak for a corrective action plan on 31 August 2017. Pyramid Peak's revised plan of 2018 was to move waste to the south and build a toe buttress, a mass of fill placed against the foot of the slope to hold it. The company would then take material off public land and regrade the pile to a stable slope.

Sources: Pyramid Peak Mining LLC, Summit Mine; Permit No. GR011ME; Waste Facility Slide; Revised Corrective Action Plan (2018-08-09): 'Material Slide', p. 2; Cover letter, p. 1

A record of construction by NewFields, written for Pyramid Peak, reports what was done. Work began in November 2018 and was substantially complete on 9 January 2019. Waste that had slid onto land managed by the Bureau of Land Management was dug out. In mid-January 2019 the regraded slope was hydroseeded, sprayed with a mix of seed and water.

Sources: NewFields for Pyramid Peak Mining, Summit Mine DMS Slide Corrective Action, Record of Construction (Technical Memorandum, NewFields Project No. 475.0386.000) (2019-01-25): Project Schedule, pp. 2-3

Santa Fe Gold at the Jim Crow and Billali, 2019 to 2024

Santa Fe Gold later bought into two mines through a subsidiary. In January 2019 Minerals Acquisitions, LLC, agreed to buy two mines from a mining operator: the Billali for $2,500,000 and the Jim Crow Imperial for $7,500,000. Santa Fe Gold said in its annual report for the year ending 30 June 2019 that the Jim Crow mine permit was transferred to Minerals Acquisitions on 20 August 2019. Site preparation for mining began in the last quarter of 2019, the company said.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2019 (filed July 2020) (2020-07-15): Item 1, 'Agreement for Two New Mexico Mining Properties'; Item 1

Mining stopped in the last week of November 2020, by Santa Fe Gold's account, after COVID-19 cases among its mine staff. A second problem, the company reported, was that the smelter it had used before no longer accepted ore from outside sources. The Jim Crow and Billali mines stayed under what the company called a maintenance protocol.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2022 (2022-10-13): Item 1, Business

Santa Fe Gold then bought a mill site. It paid $164,335 for a mill property in Duncan, Arizona, and the sale closed on 9 November 2021. According to the company, a seller had dismantled a mill in Kellogg, Idaho and moved it to the Duncan site. Patrick A. Rowe, in a 2022 abstract for the New Mexico Mineral Symposium, wrote that the Duncan mill site had first been a cotton gin. He wrote that the Billali had been rehabilitated, with underground mining planned for late 2022 or early 2023.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2022 (2022-10-13): Item 1A, Risk Factors; Patrick A. Rowe, A shining past - a glowing future - the Steeple Rock Mining District, Grant County, New Mexico (42nd New Mexico Mineral Symposium abstract) (2022-11): p. 18, 'The Glowing Future'

Santa Fe Gold's description of the district's ore closely matches wording it used for another district. Its annual reports filed in 2020 and 2022 describe Steeple Rock mineralization as numerous narrow carbonate veins, the so-called five element veins, carrying cobalt, nickel, silver, uranium and arsenic in coarse-grained quartz diorite. The wording is almost the same as the 2022 report uses for the Black Hawk district.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2022 (2022-10-13): Item 2, Properties, Steeple Rock geology

In a filing of March 2024, Santa Fe Gold said it was withdrawing from its New Mexico mining project. It wrote that the company had faced difficulty with water-rights payments, "resulting in the cancellation of the mine agreement by the water rights holders" around mid-November 2023. Financing offered to it had proved too costly, it said. It would write down $1,400,000 in mineral rights for the quarter ending 31 March 2024, the company said.

Sources: Santa Fe Gold Corporation, Form 8-K dated March 21, 2024 (Item 1.02 Termination of a Material Definitive Agreement: Mining Project Withdrawal) (2024-03-26): Item 1.02 and Item 2.05

Private ground and an old story in the Steeple Rock district

Rowe's 2022 abstract describes the Steeple Rock district's ground. Most of the larger mines, he wrote, "have been patented or otherwise are located on private property," and collectors need permission to collect. He wrote that the Carlisle Road and the Bitter Creek Road are well marked and maintained by the county. The Carlisle Road is the gravel county road that the 2014 technical report names on the route to the Summit mine.

Sources: Patrick A. Rowe, A shining past - a glowing future - the Steeple Rock Mining District, Grant County, New Mexico (42nd New Mexico Mineral Symposium abstract) (2022-11): p. 18; Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 5.1.1 Accessibility, p. 5-1

Virginia T. McLemore's road log through the district, in New Mexico Geological Society Guidebook 51, tells one story of Carlisle. It says that prostitutes built their houses along Whiskey Creek during the height of the town of Carlisle. McLemore's geological study of the district, a New Mexico Bureau of Mines and Mineral Resources open-file report, says at least two quarries there were worked for decorative stone, and no production figures for them are known.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, p. 96

Summit Gold and a planned restart, 2021 to 2026

The Summit and the Banner mill changed hands again in 2021. In May of that year Summit Gold Corporation bought the Banner mill, its tailings impoundment and its surface plant from Pyramid Peak to process Summit ore. A tailings impoundment is the walled pond that holds the finely ground waste left by a mill. Summit Gold leased the 257-acre mill site, and the land later passed to American Copper NMX, Inc. Summit Gold's 2025 permit update says it bought the Summit property, claims and infrastructure from Pyramid Peak in 2021, and it names Golconda Gold Ltd of Toronto as owner.

Sources: Summit Gold Corporation, Banner Mill and Tailings Facility Permit HI001RE, Application for Mine Permit Modification (return to active status) (2026-02-15): Section 2, p. 2; Summit Gold Corporation, Summit Mine Permit GR011ME, Permit Information Update (2025-12-27): Section 1-2, pp. 1-2

December 2025 brought two filings. On 10 December 2025 the New Mexico Environment Department prepared a public involvement plan for renewing the Banner mill's groundwater discharge permit, DP-1651, held by Summit Gold. On 27 December 2025 Summit Gold told the state that the Summit permit, GR011ME, had been continuously maintained. Summit Gold said it "intends to re-start, operate, and reclaim the mine" exactly as the approved permit allows.

Sources: New Mexico Environment Department, Ground Water Quality Bureau, Public Involvement Plan, Banner Mill, Ground Water Discharge Permit renewal DP-1651 (2025-12-10): Element 1, p. 2; Summit Gold Corporation, Summit Mine, Minimal Impact Existing Mine Permit GR011ME: transmittal letter for information update and new financial assurance (2025-12-27): Letter of December 27, 2025, p. 1

Summit Gold's permit update of December 2025 made two statements about the land. It said no cultural resources had been identified at the Summit mine site. It said the county roads and other public routes that cross the property would stay open and would not be reclaimed.

Sources: Summit Gold Corporation, Summit Mine Permit GR011ME, Permit Information Update (2025-12-27): Reclamation plan, items F and O

In a press release of 14 January 2026, Golconda Gold said it was aiming to restart the Summit mine in the second quarter of 2026. In April 2026 the state Mining and Minerals Division asked other state agencies to comment on Summit Gold Corporation's application to bring the Banner mill out of standby, and set 29 April 2026 as the deadline.

Sources: Golconda Gold Ltd., Golconda Gold Announces Appointment of New General Manager for the Summit Mine (press release, Stockwatch) (2026-01-14): Press release of 14 January 2026; NM EMNRD Mining and Minerals Division, Request for Review and Comment on Permit No. HI001RE Modification 26-1, Lordsburg Banner Mill (MMD memorandum to consulting agencies) (2026-04-09): Memorandum, p. 1

Part 7 of 9 of the series Steeple Rock and Carlisle, New Mexico: a gold and silver district on the Arizona line.

Next: Timeline →

The dated, checked records about the Steeple Rock district that the six articles rest on, in date order.

Sources

  1. The Steeple Rock district, discovered in 1860, produced an estimated $10 million in gold, silver and base metals between 1880 and 2014, with the Summit mine then on standby. Mining districts and prospect areas in New Mexico (NMBGMR Resource Map 24, booklet), Appendix 1, DIS066 (PDF p. 23). View source ↗ (reported)

"Documented" means the source is a record of the time or a direct survey; "reported" means a later account or secondary history, attributed in the text.

Cite this page: “Steeple Rock today, 2014 to 2026.” Grant County Atlas, Salars.net, first published 18 November 2026. https://atlas.salars.net/stories/steeple-rock/steeple-rock-today-2014-2026

Discussion

What would you add or question? Comments are reviewed before they appear.

Loading comments…

Join the discussion

Comments are public after approval. Please do not include links, email addresses, or private information. Read the community guidelines.