From the 1960s to the 1990s the Steeple Rock district saw drill programs and small operators; since the 1970s, Gundiler writes, their sporadic output went mainly to copper smelters as gold-bearing flux. Santa Fe Gold then built the Summit mine and the Banner mill near Lordsburg; by its own account it reached commercial production in 2012 and suspended all mining and milling on 8 November 2013 for lack of working capital.

Flux for the copper smelters, 1966 to the 1990s

At various times in the late 1980s the Center mine, in the Steeple Rock district near the Arizona line, was the third-ranked silver producer in New Mexico, after the Tyrone and Ortiz mines. D. C. Hedlund of the U.S. Geological Survey gives that ranking in his 1990 report on the Steeple Rock and Duncan districts, where he calls the Center the district's chief producer of silver. By then its ore went by truck to the ASARCO smelter in El Paso, Texas, according to Virginia T. McLemore's 2000 road log of the district for the New Mexico Geological Society.1

Sources: D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): p. 11; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Ibrahim H. Gundiler, in a short paper on milling and smelting printed with that road log, writes that sporadic production since the 1970s went mainly to regional copper smelters as gold-bearing siliceous flux. Flux is rock a smelter adds to its furnace charge; siliceous flux is rich in silica. Gundiler adds that exploration intensified in the 1980s, mostly by junior mining companies. Santa Fe Gold, the company that later built the Summit mine, described these decades in its 2013 annual report as a time of sporadic small-scale operations. They continued until the 1990s, the company said, on deposits including the Summit, Center, Mount Royal and Carlisle. Earlier, in a 1966 Geological Survey bulletin, Griggs and Wagner had put the district's total production at about $7 million, mostly gold and silver from two mines.2

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2013: Item 2, 'History of Mining and Exploration'

Drill holes and single shipments, 1965 to 1977

In 1965 the Banner Mining Co. drilled five holes on the East Camp vein, and Hedlund's table of district activity records no production from the work. In 1967 McFarland and Hullinger did percussion drilling, which breaks rock with a hammering bit, at the Jim Crow-Imperial group. The road log reports that the Grant County Mining Co. leased the Jim Crow-Imperial in 1969 and made one ore shipment. Oak Creek Contracting obtained the property in 1977.

Sources: D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): Table 1, p. 13, row 1965; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Hedlund's table shows two more efforts in 1973. The Mount Royal Mining Co. mined and heap-leached at the East Camp group; heap leaching means piling broken ore and trickling a solution through it to dissolve the gold. At the Twin Peaks mines of the Steeple Rock district, Mineral Economics Corp. and Fraser-Martin Mines drilled 2,000 feet of core, with no production listed. Fluorspar came out of the district as well: Hedlund lists 6,463 tons of fluorspar ore from the Mohawk mine on Bitter Creek, mined in 1942 to 1944 and in 1972.

Sources: D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): Table 1, p. 13, rows 1973; Table 1, p. 14, 'Fluorspar deposits'

The Hanson family and the Summit, 1975 to 1989

Several of the small operations of these years trace to one family from Duncan, Arizona. McLemore, in a 1993 study of the district's mineralization for the New Mexico Bureau of Mines and Mineral Resources, credits Douglas Hansen with rehabilitating the Summit, Center, Bank, Laura, Carlisle and East Camp mines. He shipped ore from them on and off between 1975 and 1990, she writes. Her 2000 road log and a 2014 technical report on the Summit spell the family name Hanson.

Sources: Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, p. 94; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.2 Hanson Period, p. 6-2

Two later sources give different years for the Hansons' start at the Summit. The 2014 report, a preliminary economic assessment prepared by Chapman, Wood & Griswold for Santa Fe Gold and Canarc Resource Corporation, says the Hanson family leased the Summit property in 1976. According to the road log, Summit Minerals, Inc., formed by Charles and Douglas Hanson in 1977, controlled the Summit group of mines.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.2 Hanson Period, p. 6-2; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

According to the 2014 report, the Hansons shipped about 30,000 tons of siliceous flux carrying precious metals to the ASARCO smelter at El Paso in the late 1970s and early 1980s. Hedlund lists Summit Minerals as mining the Summit from 1978 to 1985. He also lists Summit Minerals and the Sierra Corp. of El Paso working the East Camp and Summit mines in 1983 to 1987.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.2 Hanson Period, p. 6-2; D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): Table 1, p. 13, rows 1978-1985 and 1983-1987

Hedlund describes as the district's most recent activity the "short-lived, high-grade mining operations" at the Center, Summit, East Camp, Gold King, Imperial and Jim Crow mines from 1978 through 1989. He adds intermittent attempts to heap-leach gold at East Camp. At the Center, Dresser Industries mined and drilled five holes in 1977 to 1979, producing at least 10,000 tons of ore. Mount Royal Mining and Exploration Co. worked the Center from 1985 to 1988, Hedlund writes.

Sources: D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): p. 11; Table 1, p. 13, row 1977-1979; Table 1, p. 13, row 1985-1988

For the Jim Crow-Imperial the road log gives figures from the same years. Oak Creek Contracting joined with Queenstake Resources there in 1981. From 1980 to 1984 Oak Creek produced 5,035 short tons of ore averaging 3 parts per million gold and 114 parts per million silver. In 1987 Queenstake reported reserves of 155,535 short tons at the group.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Large companies test the Summit vein, 1982 to 1992

Inspiration Mines, which had a copper smelter at Globe, Arizona, optioned the Summit property from the Hansons. The 2014 report says Inspiration spent about $1.5 million exploring it. The road log says Inspiration examined the Summit vein, drilled fifteen holes along it and calculated 1.1 million short tons in three ore shoots above the 5,300-foot level.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.3, p. 6-2; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Those two sources give different dates for this work. McLemore's road log places it in 1982 to 1984, and the 2014 report in 1983 to 1984.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.3, p. 6-2

Other companies examined the district in the same decade. Hecla Mining mapped and sampled the Summit in 1984 and 1985 but dropped its option without drilling, and Noranda examined the property about 1986, the 2014 report says. McLemore lists Inspiration, Phelps Dodge, Hecla, St. Cloud, Noranda and Pioneer Nuclear among the companies with projects in the district in the 1980s. Impala Resources drilled at East Camp in 1986, and FMC drilled near Telephone Ridge in 1987. "Results of these programs are largely unknown," McLemore writes, but they led to no mining and no major discovery.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.4, p. 6-3; Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, p. 95

According to the road log, Nova Gold Resources began exploring the Summit mine area in 1988, and Biron Bay Resources became its partner in 1989. The 2014 report says that by 1992 the joint venture had spent over $7 million, most of it on drilling the Summit structure and its extension northwest to the Billali and Mohawk mines. Santa Fe Gold's annual report for fiscal 2019 dates Biron Bay's exploration of the Billali to 1990 to 1993.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.5, p. 6-3; Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2019 (filed July 2020) (2020-07-15): Item 2, 'District Historical and Prior Operations'

Counts of the Nova Gold and Biron Bay holes differ. McLemore's road log says up to 120 holes were drilled. The 2014 report gives 103 core holes, holes that bring up a solid cylinder of rock, totalling 98,826 feet.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.5, p. 6-3

McLemore reports that Biron Bay announced a Summit deposit of 1,450,000 tons grading 0.179 ounce of gold and 10.26 ounces of silver per ton. The road log gives the same reserve figure, 1,450,000 short tons, from a 1992 estimate.

Sources: Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, p. 95 (citing Petroleum and Mining Review, May 1992, p. 2); Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Flux trucks, pits and small mills, 1987 to 1999

At the Center mine, R and B Mining Co. took a lease from Mt. Royal Mining Co. of Houston in 1987. It mined through a decline, a sloping tunnel driven down from the surface, and produced silica flux rich in gold and silver, McLemore writes. In 1993 she wrote that the mining was still going on. The road log says R and B shipped the ore as siliceous flux to the ASARCO smelter in El Paso until the ore ran out in 1994.

Sources: Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, p. 95; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Mount Royal, the Center's owner, weighed building a mill. Gundiler writes that the company looked into a small flotation mill for the Center and asked the New Mexico Bureau of Mines and Mineral Resources for help. Flotation separates fine-ground mineral grains from waste rock by floating them off on a froth. Tests on Center and Carlisle ore and a flowsheet were reported in 1990. Facing rising costs and falling ore grades and metal prices, Gundiler writes, the company decided to close the mine.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

At the Carlisle, filed in 1881 among the district's first claims, production in the late 1980s and early 1990s came from an open pit and from reprocessing the old mine waste piles, according to the road log. In 1991 Weaco Exploration Ltd. found mineralized zones in drill holes west of the pit. In July 1991 Great Lakes Exploration began surface sampling and drilling at the Alabama mine, and drilled two holes that year. The road log puts the district's production from 1880 to 1991 at about $10 million in metals, including about 151,000 ounces of gold and 3.4 million ounces of silver, plus about 11,000 short tons of fluorspar.3

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

Small work continued through the decade, the road log reports. A local miner reopened the Homestake mine about 1995 and shipped a few truckloads of silica flux to the ASARCO smelter in El Paso. In 1998 a local miner built a small flotation mill at the Center from equipment bought from a small operation in the Gold Hill district of the Burro Mountains, and ran trials in the fall of 1999.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

The flooded Carlisle and the road in, 1990 to 2000

Hedlund's 1990 report gives the way in from the Arizona side: a gravel road turning east from Arizona Highway 75 about half a mile north of the Virden turn-off. The 2000 road log follows the gravel Carlisle Road from AZ-75, past the Billingsley Road junction, to a cattle guard with Mount Royal and Steeple Rock in view.

Sources: D. C. Hedlund, U.S. Geological Survey, Geology and mineral deposits of the Steeple Rock and Duncan mining districts, Grant and Hidalgo Counties, New Mexico, and Greenlee County, Arizona (USGS Open-File Report 90-239) (1990): p. 1, 'Location'; Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000)

By 2000 the Carlisle mine was flooded, the road log reports. It consisted of a three-compartment shaft 515 feet deep, with a winze, a shaft sunk from inside the mine, running from the 500-foot level to 720 feet. The Carlisle pit floods periodically, and its water can be as acid as pH 2.3. McLemore had found most water in the district fit for livestock, irrigation and some industry in her 1993 study. Water at the Carlisle mine, she wrote, was acidic and high in iron, copper, lead and zinc, and the mine was flooded below 25 meters.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 2 (groundwater), p. 89

In 2000, the road log reports, smelter slag lay in the drainage below the Carlisle waste piles, and mill tailings lined the walls of Carlisle Canyon. Foundations of the hotel, the mill and other buildings stood on the hills around the mine. McLemore warned in 1993 that abandoned shafts, pits, trenches and adits lie across the district, and that many are dangerous and should be avoided. An adit is a horizontal tunnel into a hillside.

Sources: Virginia T. McLemore (road log); Ibrahim H. Gundiler (mini-paper), Supplemental road log 2: From Lordsburg to Duncan, Arizona, and Steeple Rock district, New Mexico and Arizona (NMGS Guidebook 51, pp. 51-65), with the mini-paper 'Milling and smelting at the Steeple Rock mining district' by Ibrahim H. Gundiler (2000); Virginia T. McLemore, Geology and geochemistry of the mineralization and alteration in the Steeple Rock district, Grant County, New Mexico and Greenlee County, Arizona (NMBMMR Open-File Report 397; from her 1993 Ph.D. dissertation): Ch. 3.1, pp. 95-96

St. Cloud, AZCO and the Summit decline, 1986 to 2009

St. Cloud Mining Company and its subsidiary, the Lordsburg Mining Company, studied the Summit from about 1986, the 2014 report says. In 2000 they considered milling Summit ore at the Banner millsite near Lordsburg. Continuing low gold and silver prices, the closing of copper smelters and what the report calls onerous property agreements stopped the plan. A 2018 permit report by Pyramid Peak Mining says the Summit's mine permit, GR011ME, was first granted to Saint Cloud Mining Company in 1998 and updated in 2002.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.6, p. 6-4; Pyramid Peak Mining LLC, Summit Mine; Permit No. GR011ME; Waste Facility Slide; Revised Corrective Action Plan (2018-08-09): Corrective Action Plan, Background, p. 2

AZCO Mining bought the Summit property and the Lordsburg Mining Company in 2006, according to the 2014 report. In 2007 AZCO changed its name to Santa Fe Gold Corp. and moved its head office to Albuquerque. Development of the Summit mine and construction of the Banner mill began in early 2008. The Pyramid Peak report says the permit was transferred to the Lordsburg Mining Company in 2008.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.7, p. 6-4; Pyramid Peak Mining LLC, Summit Mine; Permit No. GR011ME; Waste Facility Slide; Revised Corrective Action Plan (2018-08-09): Corrective Action Plan, Background, p. 2

Santa Fe Gold gave its own account in its 2013 annual report. It said it had arranged $13.5 million in project capital in December 2007 and carried out construction in 2008 and 2009. The company said a 700-foot decline measuring 12 by 13 feet reached the "predicted mineralized body" at the Summit in February 2009.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2013: Item 2, Properties, Summit project

Pyramid Peak's 2018 report says the waste stockpile was built by end-dumping material from the Summit portal from 2009 to 2013. At the end of construction it held about 175,000 cubic yards on 3.75 acres and stood 135 feet high.

Sources: Pyramid Peak Mining LLC, Summit Mine; Permit No. GR011ME; Waste Facility Slide; Revised Corrective Action Plan (2018-08-09): 'DMS Construction', p. 2

Concentrate and flux from the Banner mill, 2010 to 2013

The Banner mill began processing operations in April 2010, Santa Fe Gold said in its 2013 annual report. The company said the Summit reached commercial production in the second quarter of calendar 2012. It put the total capital cost of bringing the mine into production at $28.0 million.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2013: Item 2, Properties

That annual report gives the year's sales. In the fiscal year ending 30 June 2013, Santa Fe Gold sold 218.1 tons of concentrate to Aurubis holding 1,718 ounces of payable gold and 99,441 ounces of silver. Concentrate sold to LS Nikko held 910 ounces of gold and 46,921 ounces of silver. The company sent 10,204.9 tons of flux to Asarco.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2013: Item 2, Properties, production

Chapman, Wood & Griswold tallied the whole run in the 2014 report. By the suspension in November 2013, it says, the Summit had shipped 180,690 tons to the Lordsburg mill. Of that, 110,926 tons were processed into 697.9 tons of high-grade gold and silver concentrate, most of it sold to Aurubis in Germany and some to L.S. Nikko in South Korea. About 70,000 tons of Summit ore were crushed and sold as silica flux carrying precious metals to the Asarco and Freeport-McMoRan copper smelters, through a transfer point at Duncan, Arizona.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 6.2.7, p. 6-4

A crew of thirty and the suspension of 2013

Santa Fe Gold reported 65 full-time employees in its 2013 annual report, counting its executive officers, head-office staff and the Lordsburg management and operating personnel. At the mine itself, the 2014 report says, full employment had reached 50 people. When operations stopped in November 2013 the crew numbered 30. The report describes the operation as non-union, with no bonus system.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2013: Item 1, Employees; Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 16.9, p. 16-8

Chapman, Wood & Griswold wrote that from January 2010 to November 2013 "the greatest operating problem was a lack of output from the mine." The report blamed that shortfall on poorly available equipment and an inexperienced workforce.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 16.9, p. 16-8

In its annual report for fiscal 2015, Santa Fe Gold said: "The operation was consistently under-capitalized." On 8 November 2013 the company suspended all mining and milling and placed the Summit mine and mill on care and maintenance, kept idle but looked after, for lack of working capital. The company's annual report for fiscal 2019 says Shooting Star Mining Co. explored the Billali in 2013 and 2014.

Sources: Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2015 (filed 2017): Item 1, Business (overview); Santa Fe Gold Corporation, Form 10-K for the fiscal year ended June 30, 2019 (filed July 2020) (2020-07-15): Item 2, 'District Historical and Prior Operations'

State law classed the Summit as a Minimal Impact Existing Mine, with under 10 acres of surface disturbance, according to the 2014 report. A closure plan went to the New Mexico Mining and Minerals Division, and a reclamation bond of $95,175 was posted with the division on 23 December 2013. When the report was written in 2014, a few hundred tons of material remained in stockpiles at the Banner mill site and at the transfer point in Duncan.

Sources: Chapman, Wood & Griswold, Inc., Technical Report: Preliminary Economic Assessment, Summit Gold-Silver Project, Grant and Hidalgo Counties, New Mexico (prepared for Santa Fe Gold Corporation and Canarc Resource Corporation) (2014-09-17): Section 4.1.4, p. 4-5; Section 6.2.7, p. 6-4

Part 6 of 9 of the series Steeple Rock and Carlisle, New Mexico: a gold and silver district on the Arizona line.

Next: 6. Steeple Rock today →

The bankruptcy and sale of the Summit, reclamation and the waste-dump slide, the later owners, and the Carlisle ruins today.

Sources

  1. Jones says the Steeple Rock (old Carlisle) district near the Arizona line was first prospected by Judge Potter in 1881, and its English-backed 60-stamp mill stopped in 1897 when heavy sulphide ores were reached. New Mexico Mines and Minerals: being an epitome of the early mining history and resources of New Mexican mines, pp. 68-69. View source ↗ (reported)
  2. Griggs and Wagner put the Steeple Rock district's total production at about $7 million, mostly gold and silver from two mines. Geology and ore deposits of the Steeple Rock mining district, Grant County, New Mexico (USGS Bulletin 1222-E), p. E5. View source ↗ (reported)
  3. The Carlisle, Star of the West, Center and Pennsylvania claims, the first locations in the district, were filed on 24 January 1881 by Daniel Remington, James Mounts, William Johns and A. G. P. George, all reported to have come from Carlisle, Pa. Geology and ore deposits of the Steeple Rock mining district, Grant County, New Mexico (USGS Bulletin 1222-E), p. E4 (page image checked: 'Remington'). View source ↗ (reported)

"Documented" means the source is a record of the time or a direct survey; "reported" means a later account or secondary history, attributed in the text.

Cite this page: “Exploration and the Summit mine, 1961 to 2013.” Grant County Atlas, Salars.net, first published 18 November 2026. https://atlas.salars.net/stories/steeple-rock/exploration-and-the-summit-mine-1961-2013

Discussion

What would you add or question? Comments are reviewed before they appear.

Loading comments…

Join the discussion

Comments are public after approval. Please do not include links, email addresses, or private information. Read the community guidelines.