In June 1928 the lessees of the Ground Hog mine at Vanadium sold a 51 percent interest to the American Smelting & Refining Co. because, F. W. Richard wrote, they could not market the complex ore found that spring; by the Bureau of Mines' yearly counts the mine then became the source of most of New Mexico's lead in 1941 and 1942 and the state's leading zinc producer in 1947 and 1948.
An ore body the lessees could not sell, Vanadium 1928
In the spring of 1928 the leasing company working the Ground Hog mine at Vanadium found a large body of lead-zinc-copper sulphide ore on the 400-foot level, the workings 400 feet down. Sulphide ore holds its metals combined with sulphur, and this ore was complex. F. W. Richard, who had headed the leasing company and later wrote a Bureau of Mines circular on the mine, says the company could not market it. In June 1928 the lessees sold a 51 percent interest in the property to the American Smelting & Refining Co.
Sources: F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 2, History; Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): p. 108, quoting F. W. Richard, U.S. Bur. Mines Inf. Circ. 6377, p. 2, 1930
The lessees had worked the Ground Hog since the fall of 1924. Bulletin 870, published in 1936 by Samuel G. Lasky of the Geological Survey, quotes Richard's account: the Hayward-Richard Leasing Co., working under Richard, produced 30,012 tons of lead and copper ore from then to June 1928. That ore came from small irregular bodies that seldom left as much as 500 tons in sight. The bulletin repeats Richard's reason for the sale: the new ore was complex, and the leasing company could not market it. Both the lessees and the Asarco Mining Co. shipped smelting ore from the mine during 1928, the Bureau of Mines yearly review says.
Sources: Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936); U.S. Bureau of Mines, Mineral Resources of the United States, 1928, Part I: Metals (1931): p. 546 (running head before passage; next head p. 547)
The buyer appears under two names. Lasky's 1930 circular for the New Mexico Bureau of Mines says a controlling interest went to the Asarco Mining Company, a subsidiary of the American Smelting & Refining Company. Richard's circular and Bulletin 870 give the share as 51 percent and name the parent company. On 23 June 1928 the Engineering and Mining Journal of New York reported the parent company's announcement that it had taken over the Ground Hog. The paper placed the mine near Santa Rita.
Sources: S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (1930): Circular 2, history paragraph; S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (publication page with abstract) (1930): abstract (publication page); F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 2, History; Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): p. 108, quoting Richard 1930; p. 104 names the buyer as the Asarco Mining Co., a subsidiary; Engineering and Mining Journal (New York), Engineering and Mining Journal, June 23, 1928 (vol. 125, no. 25), Arizona news: American Smelting & Refining takes over Silver Bell and the Ground Hog (1928-06-23): Arizona news, Silver Bell item
In 1928 the Ground Hog absorbed an older neighbor. Lasky writes that the San Jose claim, among the oldest in the district, had been worked only sporadically until the Ground Hog took it over in 1928. After that, he writes, most work on it was part of the Ground Hog operation. The Lucky Bill, next door, changed operators in 1928 as well. Lessees Stauber & Wright worked it until 1 July, and its owner, the Black Hawk Consolidated Mines Co., worked it for the rest of the year. All its ore went straight to the El Paso smelter.
Sources: S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 106; U.S. Bureau of Mines, Mineral Resources of the United States, 1928, Part I, Metals (1931): Part I, New Mexico, Central district, p. 546; S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (1930): Circular 2, introduction
Where the Ground Hog lay, southeast of Vanadium
Lasky's 1930 circular puts the Ground Hog mine in section 5, township 18 south, range 12 west, about three-quarters of a mile southeast of the Vanadium post office and about 2 miles southwest of Santa Rita. It sat in a saddle-like draw between the western foothills of the Santa Rita Mountains and an outlying hill. The Lucky Bill adjoined it on the southwest in the same draw. In Bulletin 870 Lasky places the mine at the head of Bayard Canyon and the Ground Hog vein southeast of Vanadium station. He puts the San Jose shaft several hundred feet northeast of the Ground Hog and the Lucky Bill shaft about 2,000 feet southwest.
Sources: S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (1930): Circular 2, introduction (abstract page text); Circular 2, introduction; S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (publication page with abstract) (1930): abstract (publication page); Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): p. 106, Location; S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 106
Richard's circular sets the mine in its wider country in 1930. He places the Ground Hog at Vanadium, about 10 miles east of Silver City, and writes that a branch of the Atchison, Topeka & Santa Fe connected Vanadium with Deming, about 45 miles southeast. Lasky adds that the district was reached by the Santa Rita-Hanover branch, which left the Deming-Silver City line at Whitewater. State Highway 11 from Deming joined Highway 180 at Bayard station.
Sources: F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 1, Introduction; Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): pp. 5-6, Geography: Location
Federal reports did not always tie the mine to the town. The Bureau of Mines review for 1928 counted Vanadium among the places of the Central mining district, with Hanover, Fierro, Santa Rita, Bayard and Georgetown, and listed the Ground Hog mine at Vanadium. Its 1929 review gave Asarco's mine at Vanadium in one passage and put it "at Hanover" in another. Later yearbooks placed the Ground Hog and San Jose near Cobre in 1931 and the Ground Hog near Hanover in 1939.
Sources: U.S. Bureau of Mines, Mineral Resources of the United States, 1928, Part I: Metals (1931): p. 534 (running head before passage; next head p. 535); U.S. Bureau of Mines, Mineral Resources of the United States, 1929, Part I: Metals (1932): p. 735 (running head before passage; next head p. None); p. 746 (running head before passage; next head p. 747); U.S. Bureau of Mines, Mineral Resources of the United States, 1931, Part I: Metals (1933): p. 304 (running head before passage; next head p. 305); U.S. Bureau of Mines, Minerals Yearbook 1940 (covering 1939): p. 399 (running head before passage; next head p. 400)
A north shaft and two counts of the first tonnage, 1928 to 1930
In the first Asarco years the Ground Hog got a new shaft, the vertical opening through which men, ore and supplies pass between the surface and the levels. Lasky writes in Bulletin 870 that the new north shaft was put down near the center of the 1928 ore body, and that the old shaft was abandoned once it was finished. Richard describes it as a three-compartment shaft, to be timbered with Oregon fir, sunk at the north end of the property because the old shaft was in bad condition.
Sources: S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 108; F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 5
The two writers differ on when the shaft was done. Lasky dates its completion to 1929. Richard's circular, issued in November 1930 but evidently written earlier, still describes the shaft as being put down.
Sources: S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 108; F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 5
Their tonnage figures for the first Asarco years are counted differently. Richard writes that from the June 1928 sale to the time he wrote, the Ground Hog produced 45,309 tons. Lasky's yearly table in Bulletin 870 records 12,275 tons for all of 1928 and 39,880 tons for 1929. Richard's count runs to the unstated time he wrote, and Lasky's figures run by calendar year. Lasky's two reports also give different kinds of figure for 1930. His 1930 circular estimates the mine's total output to 1 November 1930 at about 123,260 tons of ore worth about $2,250,000, with 39,512 tons mined between 1 January and 1 November 1930. Bulletin 870, published in 1936, records 47,287 tons for the whole of 1930.
Sources: F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 2, History; S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 109, table "Metals recovered from the Ground Hog mine, 1914-32"; p. 109, table; S. G. Lasky, New Mexico Bureau of Mines and Mineral Resources, Circular 2: Geology and Ore Deposits of the Ground Hog Mine, Central District, Grant County, New Mexico (publication page with abstract) (1930): abstract (publication page)
Custom mills at Wemple and Hanover, 1928 to 1937
Ground Hog ore was milled away from Vanadium in these years, at plants that treated other mines' ore for a fee, called custom mills. In 1928 the Peru Mining Co.'s new selective flotation mill at Wemple, near Deming, raised its capacity to 200 tons a day and began taking custom ore from the Ground Hog. Flotation separates crushed minerals by floating them off in a froth; a selective mill draws off lead and zinc in separate concentrates, the metal-rich product sent on to a smelter. In 1929 the mill's unit No. 2 ran on Asarco's Ground Hog ore while unit No. 1 treated Peru's own. During the first four months of 1930 the Ground Hog shipped sulphide ore to unit No. 1.
Sources: U.S. Bureau of Mines, Mineral Resources of the United States, 1928, Part I: Metals (1931): p. 546 (running head before passage; next head p. 547); U.S. Bureau of Mines, Mineral Resources of the United States, 1929, Part I: Metals (1932): p. 746 (running head before passage; next head p. 747); U.S. Bureau of Mines, Mineral Resources of the United States, 1930, Part I: Metals (1933): p. 803 (running head before passage; next head p. 804)
The texts place the Wemple mill slightly differently. The Bureau of Mines review for 1929 puts Wemple 3.5 miles northwest of Deming. Richard puts it about 3 miles north of Deming, and in another passage he calls it a custom mill at Deming. He writes that the mill ore averaged about 8 percent lead, 3.5 percent copper and 15 percent zinc, and that its concentrates were smelted at American Smelting & Refining's El Paso smelter. Some Ground Hog ore skipped the mill entirely. In 1929 Asarco shipped copper-silver and copper-lead-silver sulphide ore from the Ground Hog and San Jose straight to the El Paso smelter. Through 1930 it sent oxidized copper-silver ore and lead-copper-silver ore there as well.
Sources: U.S. Bureau of Mines, Mineral Resources of the United States, 1929, Part I: Metals (1932): p. 746 (running head before passage; next head p. 747); p. 747 (running head before passage; next head p. None); F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 2, History; p. 1, Introduction; U.S. Bureau of Mines, Mineral Resources of the United States, 1930, Part I: Metals (1933): p. 803 (running head before passage; next head p. 804)
From 1930 a concentrator at Hanover took Ground Hog ore. That year the Black Hawk Consolidated Mines Co. plant at Hanover treated its own Combination mine ore and similar ore from Asarco's Ground Hog unit. Rated at 175 tons a day, it averaged 160 tons when running. By 1931 it ran only as a custom mill for Ground Hog and San Jose ore. The yearbooks for 1933 and 1935 place this 250-ton concentrator a mile south of Hanover; those for 1938 and 1939 call it the 200-ton Combination mill, at and near Hanover. The yearbook covering 1938 says the Combination mill had drawn the bulk of its feed from the Ground Hog and San Jose since 1930.
Sources: U.S. Bureau of Mines, Mineral Resources of the United States, 1930, Part I: Metals (1933): p. 803 (running head before passage; next head p. 804); U.S. Bureau of Mines, Mineral Resources of the United States, 1931, Part I: Metals (1933): p. 304 (running head before passage; next head p. 305); U.S. Bureau of Mines, Minerals Yearbook 1934 (covering 1933): p. 230, Grant County, Central district (1933); U.S. Bureau of Mines, Minerals Yearbook 1936 (covering 1935), chapter: Gold, silver, copper, lead, and zinc in New Mexico: Central district (1935); U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938), chapter: Gold, silver, copper, lead, and zinc in New Mexico: p. 428, Central district (1938); U.S. Bureau of Mines, Minerals Yearbook 1940 (covering 1939): p. 410 (running head before passage; next head p. 411); U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938): p. 428 (running head before passage; next head p. 429)
Year by year the yearbooks record what went through the Hanover mill. Feed averaged 8.73 ounces of silver a ton and 15.88 percent zinc in 1931, at 160 tons a day. In 1933 it averaged 7.55 ounces and 13.28 percent zinc, and the mill ran 260 days at 225 tons a day. It ran 335 days in 1935 at 224 tons a day. In 1936 it ran 360 days at 203 tons, on feed of 4.64 ounces of silver and 7.52 percent zinc.
Sources: U.S. Bureau of Mines, Mineral Resources of the United States, 1931, Part I: Metals (1933): p. 304 (running head before passage; next head p. 305); U.S. Bureau of Mines, Minerals Yearbook 1934 (covering 1933): p. 230, Grant County, Central district (1933); U.S. Bureau of Mines, Minerals Yearbook 1936 (covering 1935), chapter: Gold, silver, copper, lead, and zinc in New Mexico: Central district (1935); U.S. Bureau of Mines, Minerals Yearbook 1937 (covering 1936): p. 470 (running head before passage; next head p. 472)
The Ground Hog workforce and wages in 1930, as the superintendent described them
Richard's circular, Mining Methods and Costs at the Ground Hog Unit, issued by the Bureau of Mines in November 1930, describes the work at the mine in detail. Richard wrote it as the mine's superintendent, the man in charge of the mine. He gives the mine about 100 men underground and on the surface, producing about 130 tons of lead-zinc-copper ore a day. He thanks four of the unit's staff for help: Julius Kruttschnitt Jr., manager; Milner Hawkins, mining engineer; R. M. Twiss, accountant; and A. A. Arluck, mine foreman.
Sources: F. W. Richard, consulting engineer, U.S. Bureau of Mines, and superintendent, Ground Hog Unit, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): section Introduction; F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 1, Introduction; p. 1, Acknowledgments; p. 9, Wages, contract and bonus system
Richard describes the men in two statements of different reach. The first covers the whole district, not the Ground Hog alone: "The labor in this district is mostly Mexican, some American-born, but largely from Mexico." The second covers the Ground Hog payroll. Americans, he writes, were hired when available, but they made up no more than 15 percent of the total payroll. "Mexican" and "American" are Richard's words, and the circular is the superintendent's account. About half the new men hired at the Ground Hog had no mining experience, Richard writes. Even so, he says, some very good miners had been trained there over five years of operation, and turnover was small.
Sources: F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 9, Wages, contract and bonus system; F. W. Richard, consulting engineer, U.S. Bureau of Mines, and superintendent, Ground Hog Unit, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): section Wages, contract and bonus system
Richard prints the wage scale in effect in February 1930, a rate per shift for each job. Trammers, who moved the ore cars, earned $3 a shift plus a bonus. Muckers, who loaded broken ore in the stopes, the open chambers where ore is broken out, earned $3.35. Machine men in the stopes, who ran the drills, earned $4.25 and timbermen $4.50 to $5.00. Timber framers and blacksmiths earned $5.50, and carpenters $7.00, the top of the scale.
Sources: F. W. Richard, consulting engineer, U.S. Bureau of Mines, and superintendent, Ground Hog Unit, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 10, wage table (February 1930); F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11): p. 10, wage table
Some men earned more than the day rate. Under the February 1930 bonus system the tram boss got $4.25 a shift plus 1 cent for each car hoisted, and each of his two trammers $3 plus 2 cents a car. All drifts, crosscuts and raises, the level and upward passages that open up the ore, were driven on contract, with drifting at $1.75 a foot. Richard writes that the contractors were chosen from the crew for length of service, ability and reliability. The mine kept no safety organization in 1930, Richard writes. A few men on each shift had first-aid training, and bosses were ordered to warn men about unsafe practices. No provision was made to fight fire underground.
Sources: F. W. Richard, U.S. Bureau of Mines, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11); F. W. Richard, consulting engineer, U.S. Bureau of Mines, and superintendent, Ground Hog Unit, Information Circular 6377: Mining Methods and Costs at the Ground Hog Unit, Asarco Mining Co., Vanadium, New Mexico (1930-11)
Low prices and the only working mine, 1931 to 1937
Lasky's table in Bulletin 870 gives the Ground Hog's yearly output and its value. It lists 47,287 tons worth $1,195,700 for 1930, 45,778 tons worth $943,400 for 1931 and 43,492 tons worth $758,600 for 1932. The 1932 row carries the table's largest silver figure, 444,800 ounces, and its largest copper figure, 3,238,000 pounds. Lasky writes that the mine had averaged more than 44,000 tons a year of silver-bearing zinc-lead-copper ore since late 1928. For 1914 to the end of 1932 he gives 221,557 tons, with metals worth $5,421,940.
Sources: S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 109, table; p. 1, Abstract; Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): pp. 108-109, Ground Hog table total row
Lasky writes that much of the Ground Hog's productive life up to 1933 coincided with the Depression, when "metal prices were abnormally low," so its output was worth much less than it would otherwise have been. In 1933 he called it the only operating mine in the Bayard area and the largest. He ranked the Lucky Bill second by production and workings, and the long-idle Ivanhoe third. By 1 April 1933, he writes, the Ground Hog vein had been explored for about 4,000 feet along its strike, or length, and 620 feet vertically. The connected workings of the Ground Hog, Lucky Bill and San Jose mines then ran to about 7.5 miles.
Sources: S. G. Lasky, U.S. Geological Survey, Geology and Ore Deposits of the Bayard Area, Central Mining District, New Mexico (USGS Bulletin 870) (1936): p. 108; p. 109, table; p. 109; Samuel G. Lasky, U.S. Geological Survey, with N.M. Bureau of Mines and Mineral Resources, Geology and ore deposits of the Bayard area, Central mining district, New Mexico (USGS Bulletin 870) (1936): p. 105, Mines and prospects; p. 105
With the Chino mine idle in 1935, the Bureau of Mines named the Ground Hog and San Jose mines and the Pecos mine of San Miguel County as New Mexico's only important copper producers. In 1936 Grant County produced 38.21 percent of the state's silver, chiefly from the Ground Hog and San Jose. Worked as a unit, the two mines yielded most of the county's silver, copper and lead that year, and part of their ore was rich enough to ship crude, without milling, to El Paso. In 1937 the Ground Hog Unit was one of the few New Mexico mines besides Chino to produce more than 1,000,000 pounds of copper. That year it carried on an extensive development campaign at the Ground Hog and San Jose and at the adjacent Lucky Bill, which it now held under lease.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1936 (covering 1935): p. 313 (running head before passage; next head p. 314); U.S. Bureau of Mines, Minerals Yearbook 1937 (covering 1936): p. 459 (running head before passage; next head p. 460); p. 470 (running head before passage; next head p. 472); U.S. Bureau of Mines, Minerals Yearbook 1938 (covering 1937): p. 391 (running head before passage; next head p. 392); p. 401 (running head before passage; next head p. 402)
A shutdown, a leased mill and the war years, 1938 to 1945
In April 1938 Asarco stopped shipping Ground Hog ore to the Combination custom mill at Hanover, and the mill closed. By then the Ground Hog and San Jose had been worked as a unit for about 10 years. Most of the 1938 drop in New Mexico's lead output, the Bureau of Mines yearbook says, came from the shutdown of the Ground Hog-San Jose group and the Combination mine after April.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938), chapter: Gold, silver, copper, lead, and zinc in New Mexico: p. 428, Central district (1938); U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938): p. 428 (running head before passage; next head p. 429); p. 417 (running head before passage; next head p. 418)
Asarco then leased the Combination mill and altered it, because the Ground Hog ore had changed in character as development went down to the 1,600-foot level. Two yearbooks date the restart differently. The volume covering 1938 says the mill was put back in operation in April 1939 on company and custom ores. The volume covering 1939 says Asarco ran it under lease from 1 March to 31 December 1939, mostly on Ground Hog ore. Its zinc concentrates went to the Amarillo smelter and its lead-copper concentrates to El Paso.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938), chapter: Gold, silver, copper, lead, and zinc in New Mexico: p. 428, Central district (1938); U.S. Bureau of Mines, Minerals Yearbook 1939 (covering 1938): p. 428 (running head before passage; next head p. 429); U.S. Bureau of Mines, Minerals Yearbook 1940 (covering 1939): p. 410 (running head before passage; next head p. 411)
The Bureau of Mines counted the Ground Hog among New Mexico's chief lead producers from 1939. That year it was the largest of the lead mines whose rising output made up for the closing of the Pecos mine. In 1939 the Bureau of Mines ranked the Ground Hog Unit 28th among the largest silver producers in the United States. The bulk of New Mexico's lead in 1941 came from the Ground Hog unit, and most of it in 1942 came from Asarco's Ground Hog mine and Hanover mill units. In 1943 the Ground Hog alone gave nearly half the state's lead.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1940 (covering 1939): p. 399 (running head before passage; next head p. 400); Gold and silver chapter, p. 58, table 'Largest producers of silver in the United States in 1939, in order of output', row 28; U.S. Bureau of Mines, Minerals Yearbook 1941 (covering 1940): p. 415 (running head before passage; next head p. 416); U.S. Bureau of Mines, Minerals Yearbook 1942: p. 442 (running head before passage; next head p. 443); U.S. Bureau of Mines, Minerals Yearbook 1943: p. 429 (running head before passage; next head p. 430)
The leased mill, now called the Hanover milling unit, served other mines as well. In 1942 about 22 percent of its feed was custom ore from small mines, from Organ, Kingston, Steins, Lordsburg and Magdalena to Cerrillos. In 1943 it ran at its 400-ton daily capacity all year on a backlog of Ground Hog-San Jose ore, with about 35 percent of its feed custom ore.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1942 (covering 1942), chapter: Gold, silver, copper, lead, and zinc in New Mexico: pp. 450-451 and county sections (1942); U.S. Bureau of Mines, Minerals Yearbook 1943: p. 438 (running head before passage; next head p. 439)
Underground, the work went deeper. In 1943 the Ground Hog was worked through a three-compartment vertical shaft to the 600-foot level and then an inclined winze, a shaft sunk from inside the mine, to the 1,800-foot level. That fall the winze was being sunk toward 2,000 feet. In 1944 the unit comprised the Ground Hog, Lucky Bill and San Jose claims, and its work included 8,939 feet of drifts and 36,088 feet of diamond drilling, which samples rock with a hollow, diamond-set bit. In 1945 the group, now including the Denver claim, added 10,255 feet of crosscuts and raises and 40,635 feet of drilling, with better ventilation. Its zinc concentrates went that year to the electrolytic zinc plant at Corpus Christi, Texas, and its lead concentrates to El Paso.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1943: p. 437 (running head before passage; next head p. 438); U.S. Bureau of Mines, Minerals Yearbook 1944: p. 417 (running head before passage; next head p. 418); U.S. Bureau of Mines, Minerals Yearbook 1945: p. 432 (running head before passage; next head p. 433)
A second company near Vanadium: the Bullfrog mine and mill, 1941 to 1946
Late in 1941 a second company entered the ground around Vanadium. The United States Smelting, Refining & Mining Co. began acquiring claims in the vicinity of Vanadium under lease and option, and it later consolidated them as the Bullfrog mine. In 1942 it sank a new 626-foot shaft and built a steel headframe, the tower over a shaft that carries the hoisting gear, along with shops, an office and a warehouse.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1942: p. 451 (running head before passage; next head p. 452)
The company let a contract in July 1942 for a 250-ton selective-flotation mill beside the Bullfrog mine. "Difficulty in obtaining equipment and carpenters retarded the normal construction progress," the Bureau of Mines yearbook for 1942 says, and the mill was not completed until March 1943. That month the mill at the Bullfrog mine at Vanadium began producing concentrates. It was enlarged to 400 tons a day in the late summer of 1943, adding much to Grant County's zinc output.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1942: p. 451 (running head before passage; next head p. 452); U.S. Bureau of Mines, Minerals Yearbook 1943: p. 438 (running head before passage; next head p. 439)
The yearbooks place the Bullfrog mill beside the mine and name it near Vanadium. In 1943 they listed "Bullfrog near Vanadium" among the nine flotation mills that treated 99 percent of New Mexico's ore, beside Asarco's Hanover unit near Hanover. In 1944 the Bullfrog mine and its 450-ton mill were the largest zinc producer in the Central district, and the company kept 13 core drills at work on its claims. By 1946 the yearbooks called the plant the Bayard mill, formerly the Bullfrog mill.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1942: p. 451 (running head before passage; next head p. 452); U.S. Bureau of Mines, Minerals Yearbook 1943: p. 438 (running head before passage; next head p. 439); p. 432 (running head before passage; next head p. 433); U.S. Bureau of Mines, Minerals Yearbook 1944: p. 416 (running head before passage; next head p. 417); U.S. Bureau of Mines, Minerals Yearbook 1946: p. 1502 (running head before passage; next head p. 1503)
A strike, a zinc price and two new shafts, 1946 to 1950
Employees of Asarco's Hanover Unit, which ran the Ground Hog mine and the Hanover mill, went on strike on 25 February 1946. The strike lasted until 17 June, and work resumed on 20 June. The Bureau of Mines yearbook says the strike cost the unit about three months of production and considerably cut its ore and zinc output for the year.
Asarco worked the Ground Hog group and the leased 400-ton Hanover mill continuously in 1947, with 7,687 feet of crosscuts and raises and 23,572 feet of diamond drilling at the mine. The Ground Hog unit led the state's zinc producers in 1947 and again in 1948, when New Mexico's recoverable zinc was 41,502 tons. That year the Hanover mill treated Asarco ore from the Ground Hog, Ivanhoe and Lucky Bill claims and custom ore from Grant and Santa Fe Counties.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1947: p. 1486 (running head before passage; next head p. 1487); p. 1479 (running head before passage; next head p. 1480); U.S. Bureau of Mines, Minerals Yearbook 1948: p. 1568 (running head before passage; next head p. 1569); p. 1573 (running head before passage; next head p. 1574)
The zinc price then broke. It fell from 17.5 cents a pound in March 1949 to 9 cents by 15 June, and Asarco worked the Ground Hog and the Hanover mill only from 1 January to 15 July 1949. Asarco's mill at Deming was built in 1949, according to a 2020 closeout plan for the mill. The plan says it was designed as a custom mill and used mainly for lead and zinc ore from the Groundhog mine, about 50 miles to the north.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1949: p. 1550 (operations); p. 1543 (zinc price paragraph); Prepared for NM EMNRD Mining and Minerals Division (for GEO SW / ASARCO trust property), Deming Mill and Mill Tailings Closeout Plan and Financial Assurance Proposal, MMD Permit LU009RE (revised) (2020-11-04): Section 2, Site History & Current Status, p. 3
Underground development went on after mining stopped in 1949. Since December 1947 Asarco had been sinking two new vertical shafts. In 1949 the four-compartment Star shaft was completed to 1,926 feet, and the three-compartment No. 5 shaft was sunk to about the 1,768-foot level. The Bureau of Mines yearbook for 1951 gives the No. 5 at 2,210 feet, with a 4,400-foot haulageway on the 1,950-foot level joining the two shafts.
Sources: U.S. Bureau of Mines, Minerals Yearbook 1949: p. 1550 (running head before passage; next head p. 1551); U.S. Bureau of Mines, Minerals Yearbook 1951: p. 1572 (running head before passage; next head p. 1573)
Part 3 of 8 of the series Vanadium, New Mexico: the Ground Hog mine and its town.
Cite this page: “The Asarco years, 1928 to 1950.” Grant County Atlas, Salars.net, first published 17 November 2026. https://atlas.salars.net/stories/vanadium/the-asarco-years-1928-1950